标题:Central Feeding System for Plastic Production
作者:
日期:2020-05-21 12:03:34
内容:
Control Room Maintenance:
1. Before starting work, firstly check whether the blower is normal and whether there is abnormal noise.
2. The high-efficiency filter must be cleaned before each shift.
3. Check the cooler for water leakage.
4. Regular maintenance according to the below table.
Item | What to Check | Checking Method | Checking Times |
Blower | abnormal noise | Listen | every 30 days |
High Efficency Filter | dust | Watch | every 7 days |
Dust Collector | dust | Open the collector | every day |
Switch | Whether the switch acts | Test | every 30 days |